Stages in the construction and installation process of prefabricated steel buildings

The construction and installation of prefabricated steel buildings is a complex process that requires smooth coordination between many stages. Here are the main stages in this process:

  1. Design:

    • Prepare detailed design drawings, including structural design, architectural design and electrical and water system design.

    • Ensure the design complies with construction standards, occupational safety and fire protection.

  2. Component fabrication:

    • Steel components are manufactured in the factory according to the design drawings.

    • The components include columns, beams, purlins, rafters, and other accessories.

  3. Transportation:

    • Steel components are transported to the construction site by specialized vehicles.

    • Ensure safety during transportation.

  4. Erection:

    • Installation of foundation bolts: Position and install foundation bolts accurately according to the drawings.

    • Erection of main frame: Erect columns, beams, rafters and other components to form the building frame.

    • Installation of purlins and roofing: Install purlins and roofing sheets, wall panels.

    • Installation of technical systems: Install electrical, water, ventilation, lighting, fire protection systems...

  5. Completion:

    • Complete other construction stages such as wall construction, door installation, painting...

    • Clean the construction site and hand over to the investor.

Source: Compiled

CATEGORIES

*YOU MAY ALSO LIKE

Pre-engineered Steel Houses Construction

A prefabricated steel building is a type of building that is constructed from steel components that have been manufactured in a factory according to technical drawings

Factory Construction

Building a factory is a complex task that requires careful preparation and strict compliance with regulations. Here are some things to keep in mind when constructing

Installing Pre-Engineered Steel Buildings

The construction of prefabricated steel buildings is a complex process that requires smooth coordination between many stages. Here are the main stages in this process.

TRUONG GIANG CONSTRUCTION COMPANY LIMITED

Office 1: National Highway 13, Hamlet 3, Minh Hung Ward, Chon Thanh District, Binh Phuoc Province
Office 2: Vinh Loc Village, Vinh Loc A Ward, Binh Chanh District, Ho Chi Minh City
Office 3: A4 Apartment Building, Quang Vinh Ward, Bien Hoa City, Dong Nai Province
Office 4: No. 251, Market Hamlet, Phuoc Loi Ward, Ben Luc, Long An Province

MY COMPANY
CONTACT US

TRUONG GIANG CONSTRUCTION COMPANY LIMITED

Address: 449 30th April Street, Phu Tho, Thu Dau Mot, Binh Duong, Vietnam

Telephone: (+84) 989.510.387

Hotline: (+84) 915.966.239

Email: Giangckxd@gmail.com

TRUONG GIANG CONSTRUCTION COMPANY LIMITED
Địa chỉ: 449 30th April Street, Phu Tho, Thu Dau Mot, Binh Duong, Vietnam
Business Registration Certificate No. 3800821120 - Issued by Department of Planning & Investment of Binh Duong Province on February 16, 2012
Responsible for content: Phan Truong Giang
@ Copyright by TRUONG GIANG CONSTRUCTION COMPANY LIMITED. Designed by Vietnam Yellow Pages.